Showing posts with label Moving in. Show all posts
Showing posts with label Moving in. Show all posts

Saturday, September 6, 2008

Moving in almost complete


Well, at least the storage unit has a lot more elbow room in it, and the shop a lot less. I brought up the remainder of the wood from the unit, as well as several boxes of cut-offs and assorted old projects which I never got a chance to finish in the Madison Woodsmith shop.

I also did the small shop shuffle, moved everything away from the end wall there in the photo and popped open the insulation batt package. Emphasis on POP. I still have one whole batt left over plus a thin strip after I cut a couple of batts to fit under the window opening. I also had to slice three batts in half to get full coverage above the 8' long batts. Quick and easy to do, and minimal itchiness thanks to the paper backing.


One of the boxes fell apart on me (poor taping job when I packed in a hurry two plus years ago). Here is some of what I found in there. A few scrollsaw fretwork portraits and some chunks of Mahagony and Oak. I have three more entire boxes of short cutoffs. THankfully I now have a lathe, and I'll be able to use them for bowl blanks, and/or cutting boards etc...



















Thursday, September 4, 2008

truck down!

Labor Day weekend is passed, where Did the summer go?


Lori was busy all weekend at the fire house, well, at the field days at the fire house to be more accurate. Bridgeport VFD has their annual field days every Labor day weekend, and she's the treasurer there, so has to handle all of the cash. Normally I spend the weekend there too, but this year, I decided that if they seemed like they could do without me, they would. Sure enough, I went to help out on Friday, and got a polite 'thank you' and got to make a few fried fish and french fries. Pretty soon however, the ladies auxiliary member whom I relieved came back and took over again. Well, I've set a move out date from the storage unit, and that date is fast approaching, so I decided that I would do my best to get a few truckloads out of there each weekend day. Good thing I did so on Saturday & Sunday, because monday Grizz convinced me that my driveline vibrations needed to be taken care of now, vs 'someday'.


The third U-joint on the shaft was shot, and Grizz took excellent care of the truck and me, getting it fixed for a lot less than a garage would have charged. Yet another big favor I owe you buddy, your day will come! The day ended with us needing to take the driveshaft to a shop to get the bearings torched to get them out. We tried hammering on them, but to no avail. Tuesday he was off, and got the job done while I was at work. Night and day thanks to this timely repair.

Sunday, August 31, 2008

Progress, lumber racks and more



I'm on a major kick to clear out my storage unit and move all of the gear up to the shop. Here was one trip's worth of lumber... I still have a bit more to come up, but it is mostly shorts and cut offs.







Speaking of shorts, I had to move the short stock I had on the lumber rack above the miter saw station, I think I need to install a couple of more brackets, that's a tad overloaded for my taste.





There's that truckload of wood up in the racks. The top level holds mostly butternut, the middle is all cherry and the lower level is maple. Most of it is still rough cut lumber, but there's a few pieces which have been dressed S4S (surfaced 4 sides for the non-woodworking reader)










This is the back end of the shop, note the sheet goods temporary storage area. along with the reflectix insulation which is going on all of the walls.

















view of the far corner of the shop, showing the wall which will get insulation and plywood installed this weekend. Might even get ambitious and put in the window, since the storage unit is almost empty!